Sacramento River Water Reservoir Roof Replacement

Location: Sacramento, CA

CYS performed a structural inspection of the current conditions of the structural elements in the roof and walls for the reservoir, evaluating the lateral force resistance of the structural systems for compliance with the CBC, and produced design documents for a repair and strengthening of the project.